description:
By adopting the PowerCore filtration medium technology and integrating the ultra-fine nanofiber technology with Donaldson's expertise in medium configuration, a more effective filtration area can be achieved in a smaller space. It offers high performance and low pressure drop through a simplified airflow path, and can replace multiple filter cartridges or bag-type filters.
product information:
| OE |
P608676 |
| Filter type |
Cellular filter Air filter |
| adaptable automobile mode |
IRIZAR PB 300KW 340KW 375KW |
| Size |
Length: 331.7 millimeters
Width: 205 millimeters
Height: 284.6 millimeters
|
|
Cross-reference
|
Length: 331.7 millimeters
Width: 205 millimeters
Height: 284.6 millimeters
|
|
Price
|
13.8$ |
|

|
|
|
|
|
OEM Support: Customized products and packaging solutions can be provided.
|
Sample Order: We welcome orders for samples for testing.
|
Quick response: We will reply to your inquiry within 24 hours.
|
Payment methods: Wire transfer, PayPal, Alipay.
|
Sample delivery: 3 - 15 days.
Order delivery time: 20-30 working days, depending on the quantity.
Transportation method: Sea freight, air freight or express delivery.
Please conduct the test immediately after receiving the product. If you encounter any problems, please contact us.

Frequently Asked Questions
Question: How is the quality of your products?
A. Our advanced machinery and materials guarantee outstanding performance and craftsmanship.
B. Customized materials and standards can be provided to meet specific market demands.
Question: What is the payment method?
Letter of Credit, Telegraphic Transfer, Documents against Payment, PayPal, Western Union Money Transfer, Small Payment, MoneyGram.
Question: Do you offer samples?
Yes, samples can be provided (either free of charge or at a fee, depending on the product); the shipping cost is borne by the buyer.
Question: What packaging options are available?
A. Customized Packaging
B. White or natural packaging
C. Color Box Options
Question: How long is the delivery time?
A. Generally, it takes 15 to 30 days.
B. Spot goods: Shipment will be made within 7 days after payment.
Question: What are the loading ports?
Guangzhou Port, Ningbo Port and Shanghai Port.
Question: What are the transportation methods?
A. Oceans, skies and land.
B. In cases where there are multiple sources of supply in China, we can assist in coordinating with the freight forwarders to integrate your goods transportation.