description:
It is mainly applicable to the Caterpillar brand excavators, with the engine model being C7.1. The specific models include 326, 330, 333, 336, 349, 352, 355, etc. These excavators are mainly used to remove dust and other particles, providing pure air for the engine, ensuring the normal operation of the engine, and the filtration efficiency is above 99.2%.
product information:
| OE |
496-9845 |
| Filter type |
Cellular filter Air filter |
| Size |
Length: 430mm
Width: 260mm
Height: 295mm / 270mm
|
| adaptable automobile mode |
for Caterpillar E330GC E336GC E340 E336 E345GC E7064MD6250 MD6310 |
|
Cross-reference
|
EA5489, SA160081 |
|
Price
|
41.6$ |
|

|
|
|
|
|
OEM Support: Customized products and packaging solutions can be provided.
|
Sample Order: We welcome orders for samples for testing.
|
Quick response: We will reply to your inquiry within 24 hours.
|
Payment methods: Wire transfer, PayPal, Alipay.
|
Sample delivery: 3 - 15 days.
Order delivery time: 20-30 working days, depending on the quantity.
Transportation method: Sea freight, air freight or express delivery.
Please conduct the test immediately after receiving the product. If you encounter any problems, please contact us.

Frequently Asked Questions
Question: How is the quality of your products?
A. Our advanced machinery and materials guarantee outstanding performance and craftsmanship.
B. Customized materials and standards can be provided to meet specific market demands.
Question: What is the payment method?
Letter of Credit, Telegraphic Transfer, Documents against Payment, PayPal, Western Union Money Transfer, Small Payment, MoneyGram.
Question: Do you offer samples?
Yes, samples can be provided (either free of charge or at a fee, depending on the product); the shipping cost is borne by the buyer.
Question: What packaging options are available?
A. Customized Packaging
B. White or natural packaging
C. Color Box Options
Question: How long is the delivery time?
A. Generally, it takes 15 to 30 days.
B. Spot goods: Shipment will be made within 7 days after payment.
Question: What are the loading ports?
Guangzhou Port, Ningbo Port and Shanghai Port.
Question: What are the transportation methods?
A. Oceans, skies and land.
B. In cases where there are multiple sources of supply in China, we can assist in coordinating with the freight forwarders to integrate your goods transportation.